Kitchen Remodel Timeline: What Happens Week by Week

From design to the final walkthrough, here’s the order a kitchen remodel happens in, how long each phase usually takes, and how to keep yours on schedule.

Get my free quotes
By the LocalQuotes.online editorial team · Updated October 22, 2026
Kitchen remodel in progress with new cabinets installed

A kitchen remodel touches almost every trade in the house: demolition, plumbing, electrical, drywall, cabinets, countertops, tile, and appliances, each in a set order. Knowing that order helps you plan for weeks without a working kitchen and spot when a contractor’s schedule doesn’t add up.

The big picture

PhaseTypical time*What happens
Planning & design2–6 weeksCollect quotes, choose a contractor, finalize layout, cabinets, and finishes
Ordering & permits2–12 weeksOrder cabinets, appliances, and fixtures; contractor pulls permits
Demolition1–3 daysOld cabinets, counters, flooring, and sometimes drywall come out
Rough-in & inspection1–2 weeksPlumbing, gas, electrical, and vent changes; rough inspection if required
Walls & flooring1–2 weeksDrywall repair, paint primer, and new flooring if it goes under the cabinets
Cabinets2–5 daysBase and wall cabinets are set, leveled, and secured
Countertops1–3 weeksTemplating after cabinets are in, then fabrication and installation
Backsplash, fixtures & appliances3–7 daysTile, sink and faucet, lighting, appliance hookups, and trim
Final inspection & punch list1–5 daysInspection, touch-ups, and a walkthrough

*General ranges. Construction for a minor remodel often runs three to six weeks; a major remodel can take two to four months once design, permits, and lead times are included. Custom work, layout changes, and busy inspection offices can stretch any phase.

Before construction: planning, ordering, and permits

Lock in the design first

Every change after cabinets are ordered costs time. Decide on the layout, cabinet style, countertop material, and appliance sizes before you sign. Appliance dimensions matter: cabinets are built around them, so pick the models early rather than after the boxes are installed.

Order early

Lead times are the most common cause of kitchen delays. Stock cabinets may be available quickly, while semi-custom and custom cabinets can take several weeks to a few months. Special-order appliances, windows, and tile can add more. Many contractors won’t start demolition until cabinets are confirmed, which keeps your kitchen from sitting gutted while you wait.

Permits

Moving a sink, adding circuits, running a new gas line, or taking out a wall usually needs a permit. Approval can take a day or several weeks depending on where you live, so ask your contractor to build it into the schedule.

Weeks 1–2: demolition and rough-in

Demolition is fast, usually a few days. Once walls and floors are open, the crew may find surprises such as water damage under the sink, outdated wiring, or uneven subfloor. This is where a 10–20% contingency budget earns its keep.

Next comes rough-in: new plumbing and gas lines, electrical circuits and outlet boxes, lighting, and range-hood ducting. If permits were pulled, an inspector typically checks this work before the walls are closed.

Weeks 2–4: walls, floors, and cabinets

Drywall is patched or replaced, and walls are primed. If new flooring runs under the cabinets, it usually goes in now. Then the cabinets are installed, leveled, and fastened, which is the moment the new kitchen starts to look real.

Weeks 4–6+: countertops, backsplash, and finish

Stone and quartz countertops can’t be cut until the cabinets are in, because the fabricator measures (templates) the actual installed boxes. Fabrication and installation often take one to three weeks, and this gap is the single most common “dead time” in a kitchen remodel. Laminate or prefabricated tops can be faster.

After the counters are set, the backsplash goes up, followed by the sink and faucet, light fixtures, appliance hookups, hardware, and trim. A final inspection and a punch-list walkthrough wrap it up.

What causes delays

Living without a kitchen

How to keep your project on schedule

  1. Get a written schedule with each phase, and ask what could delay it.
  2. Make every selection before demolition, down to cabinet hardware and grout color.
  3. Confirm deliveries before the start date.
  4. Agree on how changes are handled: in writing, with the cost and time impact spelled out.
  5. Compare two or three written quotes that include timelines. Our guide to comparing contractor quotes shows how to line them up.

Pricing out your project? See our kitchen remodel costs and quotes page. Remodeling a bathroom too? Read the bathroom remodel timeline.

Timelines here are general planning ranges, not a quote or schedule for your project. Your contractor should give you a written schedule based on your scope and local permit times.

Frequently asked questions

How long does a kitchen remodel take?

Construction for a minor remodel often takes three to six weeks. A major remodel can take two to four months once design, permits, and cabinet and appliance lead times are included.

What is the longest part of a kitchen remodel?

Usually waiting on materials. Semi-custom and custom cabinets can take weeks to months to arrive, and stone countertops can’t be fabricated until the cabinets are installed and measured.

Can I live at home during a kitchen remodel?

Most people do. Set up a temporary kitchen in another room, plan simple meals, and ask your contractor how they’ll contain dust and keep water and power available.

What order does a kitchen remodel happen in?

Typically demolition, rough-in plumbing and electrical, inspection, drywall and flooring, cabinets, countertops, backsplash, then fixtures, appliances, and a final inspection.

Are the quotes really free?

Yes. Requesting quotes through LocalQuotes.online costs you nothing and doesn’t commit you to hiring anyone. We may be compensated by the contractors and marketing partners we connect you with, which is how the service is funded.

Free quote

Find Your Local Pro or Agent Today

One form. Whether you need a home improvement contractor or an insurance agent — we match you with local, verified professionals in your ZIP code.

ZIP code matchedPros and agents who already work in your neighborhood
Licensed & verifiedEvery pro and agent is verified before joining our network
Community reviewedReal ratings from real clients in your area
100% free, no obligationGetting a quote costs nothing and commits you to nothing
Get your free local quote

Matched to local pros in your ZIP code within 24 hours.

We match you with pros in your ZIP code only
*
*
*
*
*

By clicking on "Find My Local Pros", I confirm I am the user of the telephone number(s) provided above and agree to the Terms of Service and Privacy Policy and authorize LocalQuotes.online, service professionals, their agents and marketing partners to contact me about offers by telephone calls, email and text messages to the number and email address I provided above. I consent to receive SMS text messages (msg & data rates may apply), autodialed calls, including those using prerecorded messages or artificial voice, and interactions involving generative AI chat and AI voice technologies regarding home improvement, insurance, and health related offers. I agree to receive telemarketing calls or artificial voice and pre-recorded messages via an autodialed phone system, even if my telephone number is a mobile number that is currently listed on any state, federal or corporate "Do Not Call" list or any internal opt-out or requests to stop my subscription that I may have previously submitted to LocalQuotes.online. My consent is not required as a precondition for purchasing or receiving any property, goods, or service and I can revoke my consent at any time. I understand that standard message and data rates may apply. This ad is not government affiliated. Do Not Contact.

You're matched!

We're connecting you with local pros and agents in your area. Expect a response within 24 hours — check your email for details.